Merge remote-tracking branch 'origin/develop' into nr_prs

This commit is contained in:
Sagar Parsawar
2022-08-04 14:37:05 +02:00
parent ad61b92eb8
commit 117c8bcc95
583 changed files with 156401 additions and 16331 deletions
+14 -2
View File
@@ -332,6 +332,9 @@ The following features are valid for the gNB and the 5G-NR UE.
- evalution of RSRP report
- evaluation of CQI report
- MAC scheduling of SR reception
- Bandwidth part (BWP) operation
- Handle multiple dedicated BWPs
- BWP switching through RRCReconfiguration method
**gNB RLC**
- Send/Receive operations according to 38.322 Rel.16
@@ -437,6 +440,10 @@ The following features are valid for the gNB and the 5G-NR UE.
- PTRS support
- Support for 1, 2 and 4 RX antennas
- Support for up to 2 layers (currently limited to DMRS configuration type 2)
* Measurements based on NR-CSIRS
- RI, PMI and CQI computation
- Support for 1 and 2 RX antennas
- Support for up to 2 layers
* NR-PUSCH (including Segmentation, LDPC encoding, rate matching, scrambling, modulation, RB mapping, etc).
- PUSCH mapping type A and B
- DMRS configuration type 1 and 2
@@ -485,14 +492,19 @@ The following features are valid for the gNB and the 5G-NR UE.
* UCI processing
- ACK/NACK processing
- Triggering periodic SR
- CSI measurement reporting (SSB RSRP only)
* DLSH scheduler
- CSI measurement reporting
* DLSCH scheduler
- Configuration of fapi PDU according to DCI
- HARQ procedures
* ULSCH scheduler
- Configuration of fapi PDU according to DCI
* NR-CSIRS scheduler
- Scheduling of NR-CSIRS reception
- Fill UCI for CSI measurement reporting
* Scheduler procedures for SRS transmission
- Periodic SRS transmission
* Bandwidth part (BWP) operation
- Operation in configured dedicated BWP through RRCSetup or RRCReconfiguration
**UE RLC**