docs: Standardize documentation headings (remove multiple # H1)
- Remove multiple single top-level (# H1) headings per file - Use (# H2 and ###### H6) sub-headings for consistency - Remove any trailing # in the headings - This ensures proper table of contents rendering in MkDocs. - Also removed RUN_NR_multiple_BWPs.md as it is moved to MAC usage
This commit is contained in:
committed by
Shubhika Garg
parent
a9ba6290b9
commit
5c480ffd50
@@ -14,7 +14,7 @@
|
||||
|
||||
[[_TOC_]]
|
||||
|
||||
# Introduction
|
||||
## Introduction
|
||||
The E1 interface is between the gNB-CU-CP (Central Unit - Control Plane) and gNB-CU-UP (Central Unit - User Plane) nodes. This interface is governed by the E1 Application Protocol (E1AP) outlined in the 3GPP release 16 specifications, specifically in the documents:
|
||||
|
||||
* 3GPP TS 38.463 - E1 Application Protocol (E1AP)
|
||||
@@ -28,7 +28,7 @@ The E1AP protocol consists of the following sets of functions:
|
||||
* E1 Bearer Context Management functions
|
||||
* TEID allocation function
|
||||
|
||||
## E1 Bearer Context Management function
|
||||
### E1 Bearer Context Management function
|
||||
This function handles the establishment, modification, and release of E1 bearer contexts.
|
||||
|
||||
* E1 Bearer Context Establishment: initiation of E1 bearer context is by gNB-CU-CP and acceptance or rejection is determined by gNB-CU-UP based on admission control criteria (e.g., resource availability).
|
||||
@@ -36,11 +36,11 @@ This function handles the establishment, modification, and release of E1 bearer
|
||||
* Release of Bearer Context: can be triggered either directly by gNB-CU-CP or following a request from gNB-CU-UP.
|
||||
* QoS-Flow to DRB Mapping Configuration: responsible for setting up and modifying the QoS-flow to DRB mapping configuration. gNB-CU-CP decides the flow-to-DRB mapping, generates SDAP and PDCP configurations, and provides them to gNB-CU-UP.
|
||||
|
||||
# OAI implementation
|
||||
## OAI implementation
|
||||
|
||||
For the E1AP design in OAI, please refer to the [E1 Design](./E1-design.md) document.
|
||||
|
||||
## E1 re-establishment
|
||||
### E1 re-establishment
|
||||
|
||||
The purpose of this procedure is to follow-up the re-establishment of RRC connection over the E1 interface. For all activated DRBs a Bearer Context Modification from CU-CP to CU-UP is necessary, according to clause 9.2.2.4 of 3GPP TS 38.463. If any modification to the bearer context is required, the CU-CP informs the CU-UP with the relevant IEs (e.g. in case of PDCP re-establishment, PDCP Configuration IE clause 9.3.1.38), Current implementation in OAI:
|
||||
|
||||
|
||||
Reference in New Issue
Block a user