Limitation of non SI DLSCH allocations in subframe 0/5 to PRBS not around DC (avoid puncturing from PBCH). Placement of SI around DC instead of randomized allocations. Placement of RA allocations at PRB 0-3. Tested DL throughput on 5 MHz to 16 Mbit/s in TM1.
This commit is contained in:
@@ -257,7 +257,7 @@
|
||||
#define AMP_OVER_2 (AMP>>1)
|
||||
|
||||
/// Threshold for PUCCH Format 1 detection
|
||||
#define PUCCH1_THRES 4
|
||||
#define PUCCH1_THRES 10
|
||||
/// Threshold for PUCCH Format 1a/1b detection
|
||||
#define PUCCH1a_THRES 4
|
||||
|
||||
|
||||
Reference in New Issue
Block a user