Update TESTING_GNB_W_COTS_UE.md
This commit is contained in:
@@ -1,4 +1,3 @@
|
|||||||
|
|
||||||
## Configuration Overview:
|
## Configuration Overview:
|
||||||
|
|
||||||
* Non Standalone (NSA) configuration : initial Control Plane established between UE and RAN eNB, then User Plane established between UE and gNB, Core network is 4G based supporting rel 15
|
* Non Standalone (NSA) configuration : initial Control Plane established between UE and RAN eNB, then User Plane established between UE and gNB, Core network is 4G based supporting rel 15
|
||||||
@@ -20,15 +19,15 @@ https://gitlab.eurecom.fr/oai/openairinterface5g/tree/develop
|
|||||||
|
|
||||||
photos and schemes
|
photos and schemes
|
||||||
|
|
||||||

|

|
||||||
|
|
||||||
|
|
||||||
## Build and Install
|
## Build / Install
|
||||||
|
|
||||||
General guidelines for building :
|
General guidelines for building :
|
||||||
See https://gitlab.eurecom.fr/oai/openairinterface5g/blob/develop/doc/BUILD.md#building-ues-enodeb-and-gnodeb-executables
|
See https://gitlab.eurecom.fr/oai/openairinterface5g/blob/develop/doc/BUILD.md#building-ues-enodeb-and-gnodeb-executables
|
||||||
|
|
||||||
### **EPC**
|
- **EPC**
|
||||||
|
|
||||||
for reference:
|
for reference:
|
||||||
https://github.com/OPENAIRINTERFACE/openair-epc-fed/blob/master-documentation/docs/DEPLOY_HOME.md
|
https://github.com/OPENAIRINTERFACE/openair-epc-fed/blob/master-documentation/docs/DEPLOY_HOME.md
|
||||||
@@ -39,7 +38,7 @@ cd /opt/hss_sim0609
|
|||||||
./starthss_real
|
./starthss_real
|
||||||
```
|
```
|
||||||
|
|
||||||
### **eNB**
|
- **eNB**
|
||||||
|
|
||||||
```
|
```
|
||||||
sudo bash
|
sudo bash
|
||||||
@@ -47,7 +46,7 @@ cd /opt/hss_sim0609
|
|||||||
./starthss_real
|
./starthss_real
|
||||||
```
|
```
|
||||||
|
|
||||||
### **gNB**
|
- **gNB**
|
||||||
|
|
||||||
```
|
```
|
||||||
sudo bash
|
sudo bash
|
||||||
@@ -55,9 +54,15 @@ cd /opt/hss_sim0609
|
|||||||
./starthss_real
|
./starthss_real
|
||||||
```
|
```
|
||||||
|
|
||||||
## Testing
|
## Conf Files
|
||||||
|
|
||||||
* EPC launching (on EPC host):
|
where are they
|
||||||
|
usage
|
||||||
|
|
||||||
|
## Run / Test
|
||||||
|
|
||||||
|
|
||||||
|
- **EPC** (on EPC host):
|
||||||
|
|
||||||
```
|
```
|
||||||
sudo bash
|
sudo bash
|
||||||
@@ -77,7 +82,7 @@ cd /opt/ltebox/tools
|
|||||||
Note: when terminated the testing session, you shall stop the EPC by "./stop_ltebox"
|
Note: when terminated the testing session, you shall stop the EPC by "./stop_ltebox"
|
||||||
|
|
||||||
|
|
||||||
* eNB launching (on the eNB host):
|
- **eNB** (on the eNB host):
|
||||||
|
|
||||||
~/openairinterface5g/cmake_targets/ran_build/build$ sudo ./lte-softmodem -O ../../../targets/PROJECTS/GENERIC-LTE-EPC/CONF/enb.band7.tm1.50PRB.usrpb210.conf (-E)
|
~/openairinterface5g/cmake_targets/ran_build/build$ sudo ./lte-softmodem -O ../../../targets/PROJECTS/GENERIC-LTE-EPC/CONF/enb.band7.tm1.50PRB.usrpb210.conf (-E)
|
||||||
|
|
||||||
@@ -85,14 +90,26 @@ Note: when terminated the testing session, you shall stop the EPC by "./stop_lte
|
|||||||
eNB is using branch NR_RRCConfiguration patched with enb.diff
|
eNB is using branch NR_RRCConfiguration patched with enb.diff
|
||||||
|
|
||||||
|
|
||||||
* gNB launching (on the gNB host)
|
- **gNB** (on the gNB host)
|
||||||
|
|
||||||
~/openairinterface5g/cmake_targets/ran_build/build$ sudo ./nr-softmodem -O ../../../targets/PROJECTS/GENERIC-LTE-EPC/CONF/gnb.band78.tm1.106PRB.usrpn300.conf (-E)
|
~/openairinterface5g/cmake_targets/ran_build/build$ sudo ./nr-softmodem -O ../../../targets/PROJECTS/GENERIC-LTE-EPC/CONF/gnb.band78.tm1.106PRB.usrpn300.conf (-E)
|
||||||
|
|
||||||
Note: gNB is using branch NR_RRC_PRACH_procedures patched with gnb.diff
|
Note: gNB is using branch NR_RRC_PRACH_procedures patched with gnb.diff
|
||||||
|
|
||||||
|
|
||||||
Status of the interoperability is as follows:
|
## Test Case
|
||||||
|
|
||||||
|
Test case description
|
||||||
|
|
||||||
|
## Expected Logs to check
|
||||||
|
|
||||||
|
what and where to check
|
||||||
|
|
||||||
|
## Required traces for debug
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
## Status of the interoperability
|
||||||
- setup of the CP in 4G
|
- setup of the CP in 4G
|
||||||
- setup of the measurements in 5G
|
- setup of the measurements in 5G
|
||||||
- Random access procedure initiation by the UE in the 5G cell
|
- Random access procedure initiation by the UE in the 5G cell
|
||||||
|
|||||||
Reference in New Issue
Block a user