Make sure to apply Doppler and TA not directly when receiving the target cell ntn_config,
but apply Doppler just before the initial sync, and the TA after the initial sync when
we have tha actuel cell frame and slot numbers.
We need the ntn_config when reconfiguring the PHY layer for a new initial sync,
e.g. for calculating the DL Doppler frequency.
As a dedicated scheduled_response dl_config PDU it reaches the PHY layer too late,
as part of the phy_config.config_req it reaches the PHY layer in time with the
other configuration values.
vrtsim: Optimize channel modelling
Optimization pass for channel modelling on transmission in vrtsim. This
comes from a requirement of O-RU to perform channel modelling with minimum
latency. The latency measured in O-RU 4TX 2RX on the UE is lowered from
~400 uS to ~100uS.
- Reduced MAX_CHANNEL_LENGTH to 200 and introduced SAVED_SAMPLES_LEN
- Refactored channel modelling actor allocation to parallelize work better
- Improved batching and task creation for channel modelling
- Replaced static global saved_samples with local static buffer in vrtsim_write_with_chanmod
Create a new CI pipeline for testing with vrtsim on Gracehopper:
https://jenkins-oai.eurecom.fr/job/RAN-VRT-Sim-Test-5G/
CI: adjust UE attach timeout handling
This modification addresses an issue in the RFSim-5G 2x2 test where the UE
often fails to attach within the initial 20s window. The timeout may cause
the UE to restart, which leads to two UEs appearing in the gNB log. By
increasing the initial timeout to 40s, we avoid unnecessary restarts.
- Set default attach_timeout to 40s
- Increase timeout only after failed attach attempts
This modification addresses an issue in the RFSim-5G 2x2 test where the UE
often fails to attach within the initial 20s window. The timeout may cause
the UE to restart, which leads to two UEs appearing in the gNB log. By
increasing the initial timeout to 40s, we avoid unnecessary restarts.
This function is to be called by the application to switch beams
on reception and transmission. When receiving new samples using
trx_read/trx_write the application is expected to be able to
determine which beam the samples belong to.
Reset outdated PUCCHs to avoid Assertion caused by non-processed and
active PUCCHs
When there is real-time issues in L1 it may happen that the scheduler
misses/skips some slots, thus, L2 not processing and not freeing some
structures like PUCCH. This commit avoids the Assertion by resetting
any Active outdated PUCCH
UE NTN : Fix in case SIB19 periodicity is greater than 2 secs
This was observed when testing OAI NTN UE against a third party gNB (UXM).
LEO SIB19 periodicity of > 2000 ms was used, in which case T430 timer expires
before SIB19 is re-read. This fix handles the case where SIB19 periodicity >
2secs, such that SIB19 is re-read in time and T430 timer does not expire.
Pass beam ID as per FAPI v222.10
This MR
1. Sets MSB of beam ID when passing beam ID to 7.2 radio
2. Modifies phytest scheduler to allocate SSBs on different beams
3. Introduce new MAC config parameter for beam mode to specify HiPHY or LoPHY
beamforming
In perfrom_channel_modelling, do convolution in batches which allows
vrtsim to write the channel samples as they are being produced instead
of waiting for the last sample in the slot to be ready.
Limit sample history to 256 samples and copy it into each channel modelling
task instead of relying on globally available buffer. This simplifies the code
and addressing into the saved samples buffer as well as enabling further
optimizations without sacrificing thread safety.
We assumed that PRACH FFT size is equivalent to PxSCH FFT size.
However, the parameter ru_config->fftSize is used for the C-plane Section Type 3
which is dedicated for PRACH and mixed numerology.
Based on the PRACH format, short or long, the PRACH values 256 or 1024
shall be filled.
Co-authored-by: knopp <raymond.knopp@eurecom.fr>
When doing analogue beamforming, the beam ID for a pre-defined beam
table is passed directly to RU and there is no need to store the beam
table in PHY.
When there is real-time issues in L1 it may happen that the scheduler misses/skips some slots, thus, L2 not processing and not freeing some structures like PUCCH.
This commit avoids the Assertion by resetting any Active outdated PUCCH
Integration `2025.w50`
* !3638 NR UE: calculate TA based on SIB19 information in NTN mode, if autonomous TA is not enabled
* !3624 NR UE: improve handling of Handover procedures
* !3807 doc: Update doc for IF setup
* !3741 Update documenation for handover
* !3798 Fix for computation of PRACH occasions and association period
* !3808 Add symbol timing functions for NR_DL_FRAME_PARMS + optimization for slot timing counterparts
Closes#981
See merge request oai/openairinterface5g!3806
Add symbol timing functions for NR_DL_FRAME_PARMS + optimization for slot timing
counterparts
Add two new functions for calculation symbol timestamp and symbol duration for
NR_DL_FRAME_PARMS. Also includes an optimization focused on removing
inefficiencies related slot-related counterparts.