These timings shifted slightly in an MR recently. Since it is only micro-seconds, and these thresholds are much higher in the 60 MHz (1x1 and 2x2) tests, it is safe to increase.
35 lines
873 B
YAML
35 lines
873 B
YAML
#this is a configuration file
|
|
#used to build real time processing statistics
|
|
#for 5G NR phy test (gNB terminate)
|
|
Title : Processing Time (us)
|
|
ColNames :
|
|
- Metric
|
|
- Average; Max; Count
|
|
- Average vs Reference Deviation (Reference Value; Acceptability Threshold)
|
|
Ref :
|
|
feprx : 43.0
|
|
feptx_prec : 13.0
|
|
feptx_ofdm : 33.0
|
|
feptx_total : 55.0
|
|
L1 Tx processing : 170.0
|
|
DLSCH encoding : 118.0
|
|
L1 Rx processing : 305.0
|
|
PUSCH inner-receiver : 150.0
|
|
PUSCH decoding : 210.0
|
|
Schedule Response : 30.0
|
|
DL & UL scheduling timing : 10.0
|
|
UL Indication : 40.0
|
|
Threshold :
|
|
feprx : 1.25
|
|
feptx_prec : 1.25
|
|
feptx_ofdm : 1.25
|
|
feptx_total : 1.25
|
|
L1 Tx processing : 1.25
|
|
DLSCH encoding : 1.25
|
|
L1 Rx processing : 1.25
|
|
PUSCH inner-receiver : 1.25
|
|
PUSCH decoding : 1.25
|
|
Schedule Response : 1.25
|
|
DL & UL scheduling timing : 1.25
|
|
UL Indication : 1.25
|