Files
openairinterface5g/common/utils/nr
Robert Schmidt d3026267b3 Merge remote-tracking branch 'origin/remove-sched-response-doc' into integration_2025_w46 (!3757)
Remove schedule response and update L1 threading documentation

This merge requests removes the somewhat superfluous "schedule response"
mechanism. "schedule response" was run after running the scheduler
itself and copied various FAPI messages into a global msgDataTx
structure from which the various TX/RX jobs were triggered. It is not
necessary, though, given that the scheduler is run inside the tx_func()
(running the TX jobs of the L1), and so the scheduler output FAPI
messages can directly be read into a variable of the existing
NR_Sched_Rsp_t type. This allows to delete a couple of hundred lines of
code (while retaining functionality), and simplifies the msgDataTx type
(which is still there to trigger TX job (including the scheduler) from
the ru thread).

In short, prior, there was this call chain:

- tx_func() calls run_scheduler_monolithic() (through fptr
  NR_slot_indication())
  - get some memory through allocate_sched_response() which has enough
    space for NR_Sched_Rsp_t type variable
  - call the scheduler and fill the variable
  - call nr_schedule_response() (through fptr NR_schedule_response())
    which copies into L1: to msgDataTx for TX, to separate structures
    for RX

this is changed to

- tx_func() runs one message at a time, hence we can use memory in the
  data segment for NR_Sched_Rsp_t. It calls run_scheduler_monolithic()
  through the fptr
  - pointers into NR_Sched_Rsp_t are passed to the scheduler, which
    fills as before
  - we return, memory is in its right place and does not need an extra
    copy.

Additionally, this merge request updates documentation on threading and
cleans up some unused code along the way.
2025-11-14 22:03:01 +01:00
..