E1AP procedures documentation
- new folder dedicated to E1AP docs - new file to document E1AP procedures
This commit is contained in:
@@ -75,11 +75,11 @@ sequenceDiagram
|
||||
Note over u: E1AP_CUUP_task (SCTP Handler)
|
||||
Note over u: ASN1 decoder
|
||||
```
|
||||
|
||||
More details about the E1AP procedures in OAI are available in this document: [E1 Procedures](./e1ap_procedures.md).
|
||||
|
||||
# 2. Running the E1 Split
|
||||
|
||||
The setup is assuming that all modules are running on the same machine. The user can refer to the [F1 design document](./F1-design.md) for local deployment of the DU.
|
||||
The setup is assuming that all modules are running on the same machine. The user can refer to the [F1 design document](./../F1-design.md) for local deployment of the DU.
|
||||
|
||||
## 2.1 Configuration File
|
||||
|
||||
@@ -0,0 +1,74 @@
|
||||
<table style="border-collapse: collapse; border: none;">
|
||||
<tr style="border-collapse: collapse; border: none;">
|
||||
<td style="border-collapse: collapse; border: none;">
|
||||
<a href="http://www.openairinterface.org/">
|
||||
<img src="./images/oai_final_logo.png" alt="" border=3 height=50 width=150>
|
||||
</img>
|
||||
</a>
|
||||
</td>
|
||||
<td style="border-collapse: collapse; border: none; vertical-align: center;">
|
||||
<b><font size = "5">E1AP Procedures</font></b>
|
||||
</td>
|
||||
</tr>
|
||||
</table>
|
||||
|
||||
[[_TOC_]]
|
||||
|
||||
# Introduction
|
||||
The E1 interface is between the gNB-CU-CP (Central Unit - Control Plane) and gNB-CU-UP (Central Unit - User Plane) nodes. This interface is governed by the E1 Application Protocol (E1AP) outlined in the 3GPP release 16 specifications, specifically in the documents:
|
||||
* 3GPP TS 38.463 - E1 Application Protocol (E1AP)
|
||||
* 3GPP TS 38.460 - E1 general aspects and principles
|
||||
* 3GPP TS 38.461 - E1 interface: layer 1
|
||||
* 3GPP TS 38.462 - E1 interface: signaling transport
|
||||
|
||||
The E1AP protocol consists of the following sets of functions:
|
||||
* E1 Interface Management functions
|
||||
* E1 Bearer Context Management functions
|
||||
* TEID allocation function
|
||||
|
||||
## E1 Bearer Context Management function
|
||||
This function handles the establishment, modification, and release of E1 bearer contexts.
|
||||
* E1 Bearer Context Establishment: initiation of E1 bearer context is by gNB-CU-CP and acceptance or rejection is determined by gNB-CU-UP based on admission control criteria (e.g., resource availability).
|
||||
* E1 Bearer Context Modification: can be initiated by either gNB-CU-CP or gNB-CU-UP, with the receiving node having the authority to accept or reject the modification.
|
||||
* Release of Bearer Context: can be triggered either directly by gNB-CU-CP or following a request from gNB-CU-UP.
|
||||
* QoS-Flow to DRB Mapping Configuration: responsible for setting up and modifying the QoS-flow to DRB mapping configuration. gNB-CU-CP decides the flow-to-DRB mapping, generates SDAP and PDCP configurations, and provides them to gNB-CU-UP.
|
||||
|
||||
# OAI implementation
|
||||
|
||||
For the E1AP design in OAI, please refer to the [E1 Design](./E1-design.md) document.
|
||||
|
||||
## E1 re-establishment
|
||||
|
||||
The purpose of this procedure is to follow-up the re-establishment of RRC connection over the E1 interface. For all activated DRBs a Bearer Context Modification from CU-CP to CU-UP is necessary, according to clause 9.2.2.4 of 3GPP TS 38.463. If any modification to the bearer context is required, the CU-CP informs the CU-UP with the relevant IEs (e.g. in case of PDCP re-establishment, PDCP Configuration IE clause 9.3.1.38), Current implementation in OAI:
|
||||
|
||||
```mermaid
|
||||
sequenceDiagram
|
||||
participant e as UE
|
||||
participant d as DU
|
||||
participant c as CUCP
|
||||
participant u as CUUP
|
||||
|
||||
Note over e,c: RRCReestablishment Procedure
|
||||
e->>d: RRCReestablishmentRequest
|
||||
Note over d: initial_ul_rrc_message_transfer_f1ap
|
||||
d->>+c: Initial UL RRC Message Transfer (CCCH, new C-RNTI)
|
||||
Note over c: rrc_gNB_process_initial_ul_rrc_message
|
||||
Note over c: rrc_handle_RRCReestablishmentRequests
|
||||
c-->>+d: DL RRC Message Transfer
|
||||
note right of d: fallback to RRC establishment
|
||||
d-->>-e: RRCSetup
|
||||
e-->>d: RRCSetupComplete
|
||||
Note over c: rrc_gNB_generate_RRCReestablishment
|
||||
Note over c: cuup_notify_reestablishment
|
||||
Note over c: e1apCUCP_send_BEARER_CONTEXT_MODIFICATION_REQUEST
|
||||
c->>u: BEARER CONTEXT MODIFICATION REQUEST
|
||||
Note over u: e1apCUUP_handle_BEARER_CONTEXT_MODIFICATION_REQUEST
|
||||
Note over u: e1_bearer_context_modif
|
||||
Note over u: nr_pdcp_reestablishment
|
||||
c->>-d: DL RRC Message Transfer (old gNB DU F1AP UE ID)
|
||||
d->>e: RRCReestablishment
|
||||
Note over d: Fetch UE Context with old gNB DU F1AP UE ID and update C-RNTI
|
||||
e->>d: RRCReestablishmentComplete
|
||||
u->>c: BEARER CONTEXT MODIFICATION RESPONSE
|
||||
Note over c: e1apCUCP_handle_BEARER_CONTEXT_MODIFICATION_RESPONSE
|
||||
```
|
||||
+1
-1
@@ -57,7 +57,7 @@ Legacy unmaintained files:
|
||||
# Designs
|
||||
|
||||
- General software architecture notes: [SW_archi.md](./SW_archi.md)
|
||||
- [Information on E1](./E1-design.md)
|
||||
- [Information on E1](./E1AP/E1-design.md)
|
||||
- [Information on F1](./F1-design.md)
|
||||
- [Information on how NR nFAPI works](./NR_NFAPI_archi.md)
|
||||
- [Flow graph of the L1 in gNB](SW-archi-graph.md)
|
||||
|
||||