UE feature set update

This commit is contained in:
francescomani
2024-07-22 17:53:53 +02:00
committed by Robert Schmidt
parent e8a083767a
commit 76aaf60dd1
+9 -5
View File
@@ -226,7 +226,8 @@ Furthermore, the gNB and UE support
## NR UE PHY Layer ##
* Initial synchronization
- the UE needs to know the position in frequency of the SSBs (via command line parameter in SA)
- non-blind synchronization (information required: carrier frequency, bandwidth, numerology)
- option to search SSB inside the bandwidth available
* Time tracking based on PBCH DMRS
* Frequency offset estimation based on PSS and SSS
* 15kHz and 30kHz SCS for FR1 and 120 kHz SCS for FR2
@@ -281,7 +282,7 @@ Furthermore, the gNB and UE support
* MAC -> PHY configuration via UE FAPI P5 interface
* Basic MAC to control PHY via UE FAPI P7 interface
* PHY -> MAC indication (needs some improvement)
* PHY -> MAC indication
## NR UE Higher Layers ##
@@ -303,19 +304,21 @@ Furthermore, the gNB and UE support
- format 01 (C-RNTI)
* UCI processing
- ACK/NACK processing
- Triggering periodic SR
- CSI measurement reporting
- Scheduling request procedures
- CSI measurement reporting (periodic and aperiodic)
* DLSCH scheduler
- Configuration of fapi PDU according to DCI
- HARQ procedures
* ULSCH scheduler
- Configuration of fapi PDU according to DCI
- Buffer status reporting procedures
- Logical channel prioritization of 'data from any logical channel'
- UCI on PUSCH
* NR-CSIRS scheduler
- Scheduling of NR-CSIRS reception
- Fill UCI for CSI measurement reporting
* Scheduler procedures for SRS transmission
- Periodic SRS transmission
- Periodic and aperiodic SRS transmission
* Bandwidth part (BWP) operation
- Operation in configured dedicated BWP through RRCSetup or RRCReconfiguration
@@ -352,6 +355,7 @@ Furthermore, the gNB and UE support
- RRCSetupRequest/RRCSetup/RRCSetupComplete
- RRC Uplink/Downlink Information transfer carrying NAS messages transparently
- RRC Reconfiguration/Reconfiguration complete
- RRCReestablishmentRequest/RRC Reestablishment/Reestablishment complete
- Support for master cell group configuration
- Reception of UECapabilityEnquiry, encoding and transmission of UECapability
* Interface with PDCP: configuration, DCCH and CCCH message handling