UE feature set update
This commit is contained in:
committed by
Robert Schmidt
parent
e8a083767a
commit
76aaf60dd1
+9
-5
@@ -226,7 +226,8 @@ Furthermore, the gNB and UE support
|
||||
## NR UE PHY Layer ##
|
||||
|
||||
* Initial synchronization
|
||||
- the UE needs to know the position in frequency of the SSBs (via command line parameter in SA)
|
||||
- non-blind synchronization (information required: carrier frequency, bandwidth, numerology)
|
||||
- option to search SSB inside the bandwidth available
|
||||
* Time tracking based on PBCH DMRS
|
||||
* Frequency offset estimation based on PSS and SSS
|
||||
* 15kHz and 30kHz SCS for FR1 and 120 kHz SCS for FR2
|
||||
@@ -281,7 +282,7 @@ Furthermore, the gNB and UE support
|
||||
|
||||
* MAC -> PHY configuration via UE FAPI P5 interface
|
||||
* Basic MAC to control PHY via UE FAPI P7 interface
|
||||
* PHY -> MAC indication (needs some improvement)
|
||||
* PHY -> MAC indication
|
||||
|
||||
## NR UE Higher Layers ##
|
||||
|
||||
@@ -303,19 +304,21 @@ Furthermore, the gNB and UE support
|
||||
- format 01 (C-RNTI)
|
||||
* UCI processing
|
||||
- ACK/NACK processing
|
||||
- Triggering periodic SR
|
||||
- CSI measurement reporting
|
||||
- Scheduling request procedures
|
||||
- CSI measurement reporting (periodic and aperiodic)
|
||||
* DLSCH scheduler
|
||||
- Configuration of fapi PDU according to DCI
|
||||
- HARQ procedures
|
||||
* ULSCH scheduler
|
||||
- Configuration of fapi PDU according to DCI
|
||||
- Buffer status reporting procedures
|
||||
- Logical channel prioritization of 'data from any logical channel'
|
||||
- UCI on PUSCH
|
||||
* NR-CSIRS scheduler
|
||||
- Scheduling of NR-CSIRS reception
|
||||
- Fill UCI for CSI measurement reporting
|
||||
* Scheduler procedures for SRS transmission
|
||||
- Periodic SRS transmission
|
||||
- Periodic and aperiodic SRS transmission
|
||||
* Bandwidth part (BWP) operation
|
||||
- Operation in configured dedicated BWP through RRCSetup or RRCReconfiguration
|
||||
|
||||
@@ -352,6 +355,7 @@ Furthermore, the gNB and UE support
|
||||
- RRCSetupRequest/RRCSetup/RRCSetupComplete
|
||||
- RRC Uplink/Downlink Information transfer carrying NAS messages transparently
|
||||
- RRC Reconfiguration/Reconfiguration complete
|
||||
- RRCReestablishmentRequest/RRC Reestablishment/Reestablishment complete
|
||||
- Support for master cell group configuration
|
||||
- Reception of UECapabilityEnquiry, encoding and transmission of UECapability
|
||||
* Interface with PDCP: configuration, DCCH and CCCH message handling
|
||||
|
||||
Reference in New Issue
Block a user