UE feature set update
This commit is contained in:
committed by
Robert Schmidt
parent
e8a083767a
commit
76aaf60dd1
+9
-5
@@ -226,7 +226,8 @@ Furthermore, the gNB and UE support
|
|||||||
## NR UE PHY Layer ##
|
## NR UE PHY Layer ##
|
||||||
|
|
||||||
* Initial synchronization
|
* Initial synchronization
|
||||||
- the UE needs to know the position in frequency of the SSBs (via command line parameter in SA)
|
- non-blind synchronization (information required: carrier frequency, bandwidth, numerology)
|
||||||
|
- option to search SSB inside the bandwidth available
|
||||||
* Time tracking based on PBCH DMRS
|
* Time tracking based on PBCH DMRS
|
||||||
* Frequency offset estimation based on PSS and SSS
|
* Frequency offset estimation based on PSS and SSS
|
||||||
* 15kHz and 30kHz SCS for FR1 and 120 kHz SCS for FR2
|
* 15kHz and 30kHz SCS for FR1 and 120 kHz SCS for FR2
|
||||||
@@ -281,7 +282,7 @@ Furthermore, the gNB and UE support
|
|||||||
|
|
||||||
* MAC -> PHY configuration via UE FAPI P5 interface
|
* MAC -> PHY configuration via UE FAPI P5 interface
|
||||||
* Basic MAC to control PHY via UE FAPI P7 interface
|
* Basic MAC to control PHY via UE FAPI P7 interface
|
||||||
* PHY -> MAC indication (needs some improvement)
|
* PHY -> MAC indication
|
||||||
|
|
||||||
## NR UE Higher Layers ##
|
## NR UE Higher Layers ##
|
||||||
|
|
||||||
@@ -303,19 +304,21 @@ Furthermore, the gNB and UE support
|
|||||||
- format 01 (C-RNTI)
|
- format 01 (C-RNTI)
|
||||||
* UCI processing
|
* UCI processing
|
||||||
- ACK/NACK processing
|
- ACK/NACK processing
|
||||||
- Triggering periodic SR
|
- Scheduling request procedures
|
||||||
- CSI measurement reporting
|
- CSI measurement reporting (periodic and aperiodic)
|
||||||
* DLSCH scheduler
|
* DLSCH scheduler
|
||||||
- Configuration of fapi PDU according to DCI
|
- Configuration of fapi PDU according to DCI
|
||||||
- HARQ procedures
|
- HARQ procedures
|
||||||
* ULSCH scheduler
|
* ULSCH scheduler
|
||||||
- Configuration of fapi PDU according to DCI
|
- Configuration of fapi PDU according to DCI
|
||||||
|
- Buffer status reporting procedures
|
||||||
- Logical channel prioritization of 'data from any logical channel'
|
- Logical channel prioritization of 'data from any logical channel'
|
||||||
|
- UCI on PUSCH
|
||||||
* NR-CSIRS scheduler
|
* NR-CSIRS scheduler
|
||||||
- Scheduling of NR-CSIRS reception
|
- Scheduling of NR-CSIRS reception
|
||||||
- Fill UCI for CSI measurement reporting
|
- Fill UCI for CSI measurement reporting
|
||||||
* Scheduler procedures for SRS transmission
|
* Scheduler procedures for SRS transmission
|
||||||
- Periodic SRS transmission
|
- Periodic and aperiodic SRS transmission
|
||||||
* Bandwidth part (BWP) operation
|
* Bandwidth part (BWP) operation
|
||||||
- Operation in configured dedicated BWP through RRCSetup or RRCReconfiguration
|
- Operation in configured dedicated BWP through RRCSetup or RRCReconfiguration
|
||||||
|
|
||||||
@@ -352,6 +355,7 @@ Furthermore, the gNB and UE support
|
|||||||
- RRCSetupRequest/RRCSetup/RRCSetupComplete
|
- RRCSetupRequest/RRCSetup/RRCSetupComplete
|
||||||
- RRC Uplink/Downlink Information transfer carrying NAS messages transparently
|
- RRC Uplink/Downlink Information transfer carrying NAS messages transparently
|
||||||
- RRC Reconfiguration/Reconfiguration complete
|
- RRC Reconfiguration/Reconfiguration complete
|
||||||
|
- RRCReestablishmentRequest/RRC Reestablishment/Reestablishment complete
|
||||||
- Support for master cell group configuration
|
- Support for master cell group configuration
|
||||||
- Reception of UECapabilityEnquiry, encoding and transmission of UECapability
|
- Reception of UECapabilityEnquiry, encoding and transmission of UECapability
|
||||||
* Interface with PDCP: configuration, DCCH and CCCH message handling
|
* Interface with PDCP: configuration, DCCH and CCCH message handling
|
||||||
|
|||||||
Reference in New Issue
Block a user