Update TESTING_GNB_W_COTS_UE.md
This commit is contained in:
@@ -5,7 +5,7 @@
|
||||
* Commercial UE: Oppo Reno 5G
|
||||
* OAI Software Defined gNB and eNB
|
||||
* eNB RF front end: USRP (ETTUS) B200 Mini or B210
|
||||
* gNB RF front end: USRP (ETTUS) B200 Mini or B210 (N300 will be needed for MIMO and wider BW's)
|
||||
* gNB RF front end: USRP (ETTUS) B200 Mini or B210 (N310 will be needed for MIMO and wider BW's)
|
||||
* 5G TDD duplexing mode
|
||||
* 5G FR1 Band n78 (3.5 GHz)
|
||||
* BW: 40MHz
|
||||
@@ -17,7 +17,7 @@ https://gitlab.eurecom.fr/oai/openairinterface5g/tree/develop
|
||||
|
||||
## Architecture Setup
|
||||
|
||||
photos and schemes
|
||||
The scheme below depicts our typical setup:
|
||||
|
||||

|
||||
|
||||
@@ -32,32 +32,27 @@ See https://gitlab.eurecom.fr/oai/openairinterface5g/blob/develop/doc/BUILD.md#b
|
||||
for reference:
|
||||
https://github.com/OPENAIRINTERFACE/openair-epc-fed/blob/master-documentation/docs/DEPLOY_HOME.md
|
||||
|
||||
|
||||
```
|
||||
sudo bash
|
||||
cd /opt/hss_sim0609
|
||||
./starthss_real
|
||||
sudo
|
||||
```
|
||||
|
||||
- **eNB**
|
||||
|
||||
```
|
||||
sudo bash
|
||||
cd /opt/hss_sim0609
|
||||
./starthss_real
|
||||
sudo
|
||||
```
|
||||
|
||||
- **gNB**
|
||||
|
||||
```
|
||||
sudo bash
|
||||
cd /opt/hss_sim0609
|
||||
./starthss_real
|
||||
sudo
|
||||
```
|
||||
|
||||
## Conf Files
|
||||
|
||||
where are they
|
||||
usage
|
||||
where are the config files located
|
||||
how to use them
|
||||
|
||||
## Run / Test
|
||||
|
||||
@@ -65,9 +60,7 @@ usage
|
||||
- **EPC** (on EPC host):
|
||||
|
||||
```
|
||||
sudo bash
|
||||
cd /opt/hss_sim0609
|
||||
./starthss_real
|
||||
sudo
|
||||
```
|
||||
|
||||
Open another window and:
|
||||
@@ -75,8 +68,7 @@ Open another window and:
|
||||
```
|
||||
sudo bash
|
||||
cd /opt/ltebox/tools
|
||||
./stop_ltebox
|
||||
./start_ltebox
|
||||
|
||||
```
|
||||
|
||||
Note: when terminated the testing session, you shall stop the EPC by "./stop_ltebox"
|
||||
@@ -99,15 +91,15 @@ Note: gNB is using branch NR_RRC_PRACH_procedures patched with gnb.diff
|
||||
|
||||
## Test Case
|
||||
|
||||
Test case description
|
||||
Test case description : UE attachement
|
||||
|
||||
## Expected Logs to check
|
||||
|
||||
what and where to check
|
||||
what logs and where to check, to ensure that your setup works fine
|
||||
|
||||
## Required traces for debug
|
||||
|
||||
|
||||
What info/traces/logs are needed for us to support the debug
|
||||
|
||||
## Status of the interoperability
|
||||
- setup of the CP in 4G
|
||||
|
||||
Reference in New Issue
Block a user