- Set the correct QoS flow ID to associate a correct QoS flow to the
bearer: the UE would misassociate otherwise
- Set the DRB as the default: the handler applies bool with true==1, so
use bool value
This allows to communicate with multiple remote hosts. A further
improvement would be to refactor this piece of code into a function and
call it only when necessary, i.e., when we know the remote host, or want
to add one to a list of hosts.
This commit introduces the capability to handle multiple CU-UPs. It uses
a RB tree and puts the CU-UPs into the tree. Upon the connection, it
associates UEs to CU-UPs in a round-robin fashion.
A later commit will introduce an RB tree to manage multiple CU-UPs. The
RB tree implementation relies on some macros that generate RB tree
functions. Functions using the RB tree implementation will be grouped in
this file.
The E1AP Setup Request contained the network configuration (IP address,
ports) as well as the actual E1AP Setup Request application data
(Supported PLMNs, ...). This has the drawbacks that
- The E1AP Setup Request is stored to retrieve IP addresses in the E1AP
module, which is confusing as the Setup Request, per standard, has no IP
info
- The CU-CP received an E1 Setup Request for configuration during start
up, but it did not actually receive such Setup Request, but merely the
IP configuration to set up the socket
This commit splits the E1AP Setup Request into a "real" Setup Request
for application data, and creates a new type e1ap_net_config_t to group
all IP configuration data. Further, a new ITTI message type
E1AP_REGISTER_REQ is introduced to group both types. What happens is
- RCconfig_NR_CU_E1() reads both E1AP application-level data and IP
configuration, as previously
- The data is sent to the CU-CP. It discards the E1AP Setup Request
data, and only uses the network configuration to set up the socket
- The data is sent to the CU-UP. It uses the network configuration to
connect to the CU-CP, and then sends the E1AP Setup Request to the
CU-CP.
Currently, the CU-CP still stores the Setup Request locally, which will
be changed in the next commit to send it to the RRC.
The DRBLists inside E1AP message are for E-UTRAN. We don't support that
with our CU-CP/UP yet, so remove it to reduce ambiguity and complexity.
For the same reason, we remove the CN Support, which for us is always
"NR".
Integration Branch 2023.w42
See merge request oai/openairinterface5g!2403
* !2368 NR UE SRB0
* !2399 build_oai: Auto-detect if terminal supports colors
* !2398 Correctly load channel models
* !2365 Change PDU_Length and tlv length calculation to be inline with SCF 222.10.02
* !2402 chore(ci): enabling the ARM cross-compilation pipeline
* !2397 fix(ci): improve for parallelism issue in Groovy
* !2405 Clean IDE files and remove old documentation
This enables build_oai to detect if the output terminal supports colors.
If it does, it will use colors in its output. If it does not, it will
just print the text, without color codes, improving legibility.
integration_2023_w41
See merge request oai/openairinterface5g!2394
* !2389 Remove global variable rx_spatial_power
* !2364 NR UE PUCCH2 sanitize errors
* !2352 Break DCI processing function into smaller pieces
* !2391 Remove calloc from L1 at CSIRS_PDU conversion function
* !2393 Fix UE assertion due to PUCCH resource lookup all BWPs
* !2307 Improve documentation for L2sim Readme
* !2310 doc(websvr): how to install properly the dependencies
integration_2023_w40
See merge request oai/openairinterface5g!2381
* !2345 fix bug for IE cause in pdu session accept
* !2361 Fix Msg3 MAC CE C-RNTI
* !2371 fix(ci): printing the warning and error lines for CI purposes
* !2374 Fix SSB ARFCN: wrong ARFCNs in FDD
* !2379 fix the selection of DCI candidates at UE
* !2369 Add bwp_size and bwp_start fields to CSI_RS PDU struct at NR UE
* !2349 E2AP Version 1,2,3 and KPM version 2, 3
* !2375 increase the max fd of rfsim, that have been shorten to tightly for cpu saving
* !2367 chore(ci): improve GitLab <-> Jenkins contributor experience
* !2378 F1AP: correct message handling
* !2370 NR PDCP RB suspend
* !2107 Compute RI based on SRS up to 4
* !2339 PUCCH power computation
* !2382 Remove dead code in NR UE
* !2229 PUSCH LLR 128/256 SIMDe routines for ARM/x86
The RRC container is to be handled by the msg handler in
mac_rrc_dl_handler.c. Therefore, don't forward the RRC message, but copy
it into the message so the handler can take the action.
integration_2023_w39
See merge request oai/openairinterface5g!2363
* !2142 Fix packing/unpacking procedures for P7 messages
* !2253 Parallelize the Compensation, LLR, layer de-mapping, and unscrambling with symbol
* !2319 Fix NR UE init RA
* !2343 Reverse bits in UCI message when using polar encoding/decoding
* !2348 Resolve "SIGSEGV in nr-softmodem @ 100MHz on USRP"
* fix phytest-timing thresholds after merge of !2253
* !2320 Reduce ITTI log message volume when queues full
* !2360 nr rlc: minor: fix tests
* !2359 nr rlc am: bugfix: correct usage of tx_next
* !2356 Const return values
* !2357 Fix compile error when --build-e2 option included
* !2340 Resolve "gNB build on ubuntu 22.04 fails with dpkg error"
* !2362 Implement F1 bearer release and add telnet module
* !2324 Refactor gNB ULSCH decoding
* fix for SSB ARFCN in RRC MeasConfig
The UE should measure on the SSB, otherwise it does not see anything.
Hence, this commit fixes the meas-config to request the UE to measure
on the right frequency.