integration_2023_w13
See merge request oai/openairinterface5g!2037
* !1945 Free RNTI related structures at PHY after UE disconnection
* !2011 Creation of new pipeline LTE-TDD-2x2-container
* !1854 Handle reconfigurationWithSync
* !2019 bugfix: LDPC decoding in the gNB: clear d properly
* !2038 Fix DL 2x2 errors
* !2039 Adding test-case in XML to reset USRP in LTE-TDD pipeline
* !2008 Implement NR-UE Deregistration procedure
* !2023 Rework PDCP OAI API to allow custom SRB data forwarding (e.g., in F1)
* !2015 Update documentation: CI, general README.md, overview of doc README, various improvements
The GTP module is common for 4G and 5G. It hardcodes the functions to
call when creating S1U and NGU tunnels. The S1U case is both applicable
for LTE and NR (NSA), which until now was not a problem as the PDCP data
forwarding functions where called pdcp_data_req. The issue is that in this
branch, the NR PDCP functions have changed to nr_pdcp_data_req_drb().
When setting up a GTP tunnel, we now pass the PDCP data forwarding
functions into GTP, since the caller knows whether it is in 4G or 5G,
but GTP itself does not.
In the UE, we wish to handle ^C in the UE to send a message before
terminating, so we allow custom wait handlers to implement such
functionality. Use itti_wait_tasks_unblock() to unblock
itti_wait_tasks_end().
Also, implement itti_wait_tasks_end() using semaphores, as signals are
not async-signal-safe (and therefore should not be used in a signal
handler).
nr_pdcp_entity_recv_sdu() processes PDCP SDUs, and forwards the PDU at the
end of the function, while having the PDCP lock. This can lead to
deadlocks, e.g., when another thread goes through RLC and tries to
access the PDCP while the PDCP tries to lock the RLC.
This commit changes the logic: instead of having recv_sdu() forward the
PDU directly, it fills a buffer with the PDU (thus the name change to
process_sdu()), and returns. We then unlock the PDCP, before forwarding
the PDU, thus eliminating potential deadlocks.
Creates function that have nr_pdcp_ prepended to their name, and change
the signature of some functions for the 5G PDCP:
- nr_pdcp_layer_init()
- nr_pdcp_data_req()
- nr_pdcp_remove_UE()
- nr_pdcp_config_set_security()
- nr_pdcp_remove_UE()
- Make separate functions for nr_pdcp_data_req_srb/drb()
The message is never sent to the RRC. And this message is to be
forwarded by the DU to the UE, hence it should not even be handled by
the RRC (as the RRC in the CU sends it).
During the Initial UL RRC Message, the CellGroup is created. Since the
CellGroup specifies the SRB1, the SRB1 should also be created (because
the DL RRC Messages is sent via SRB1). However, before this commit, the
CellGroup is created while having the RLC lock, so we cannot create
SRB1, as it results in a deadlock.
Therefore, we now first create CellGroup, SRB0, and SRB1, before giving
the UE message to the RLC.
integration_2023_w11b
See merge request oai/openairinterface5g!2020
* !1833 NR ULSCH transform precoding improvements
* !1929 Implementing bands greater than 64 in the code, feature #603
* !1982 Rework ngap
* !1998 Update NR RRC to version 17.3.0
* !2003 improve NR UE state machine
* !2007 possibility to set identity precoding matrix from config file
* !2009 Use same configurable port number for local and remote N3
* !2012 fix unaligned IDFT
* !2013 doc(tutorial): switching to jinja-rendering configuration on the OAI-CN5 containers
* !2018 demote two UL scheduler warnings to debug level
integration_2022_wk11
See merge request oai/openairinterface5g!2010
* !1849 Set t-Reordering to 100ms to prevent packet loss
* !1997 Warnings in Ubuntu20 build make CI fail
* !2000 bugfix: bad usage of T() in the log module
* !2005 Fix RNTI after RRCReestablishment
* !2006 avoid segfault in additional BWP configuration
* !2001 Add reestablishment test to SA Quectel test
* !1974 Tutorials: split tutorials in three files, OAI_CN5G, COTS_UE and OAI_nrUE
* !1993 Remove unused dependencies, modules