Add the ability to pack/unpack 2 new TLVs for analog beamforming
total_num_beams_vendor_ext and analog_beam_list
Add the unpack related changes for the first 2 vendor extension TLVs introduced related to beamforming.
For the moment the packing is guarded by an Assert to ensure it is not used.
Add the necessary utility function changes to support these VE TLVs
Add the necessary changes to the corresponding unitary test for pack/unpack,
commented for the moment, since the packing is disabled with an Assert.
Fix data race in NR UE MSG3 scheduling
Fixed a data race between DL processing of RAR and UL scheduler, which might
result in dropping MSG3.
It was possible that the UL scheduler for the UL slot which RAR indicates as
MSG3 slot was already run by the time the RAR was decoded.
Therefore when DCI for RAR is decoded, assume worst case and halt UL scheduler
for next slot until RAR is decoded solving the data race. This also in turn
halts all later scheduling due to sequential nature of the UL scheduler calls.
Closes#962
Fixed a data race between DL processing of RAR and UL scheduler, which
might result in dropping MSG3.
It was possible that the UL scheduler for the UL slot which RAR
indicates as MSG3 slot was already run by the time the RAR was decoded.
Therefore when DCI for RAR is decoded, assume worst case and halt the
earliest corresponding UL scheduler call until RAR is decoded solving
the data race. This also in turn halts all later scheduling due to
sequential nature of the UL scheduler calls.
A number of radio-related RRC parameters, e.g., CellGroupConfig,
"originate" at the DU and are sent to the CU for forwarding to the UE
only. Similarly, there are additional parameters, e.g., RLC-BearerConfig
(part of CellGroupConfig), that originate at the DU.
Hence, the DU decides about these parameters, depending on the MAC state
and capabilities. To clarify this, move the existing
openair2/RRC/NR/nr_rrc_config.{c,h} => openair2/LAYER2/NR_MAC_gNB/nr_radio_config.{c,h}
So that developers know that while those are RRC parameters, they
originate at the DU.
In other words, the CU/RRC is not supposed to use any of these functions
in the RRC. Correspondingly, includes of this file have been cleaned up
(and when they are not necessary at the MAC as well).
Fix PDSCH and PUSCH BWP Start and Size when PXSCH is scheduled with a DCI format x_0 in any type of PDCCH common search space
- Fix PDSCH and PUSCH BWP Start and Size when PDSCH/PUSCH is scheduled
with a DCI format x_0 in any type of PDCCH common search space
- Fix resource block assignment information (RIV field) for DCI format
x_0 when scheduling in any type of PDCCH common search space
Move this message down, at the end of the function, if no code path
exists under which msg3 allocation might fail despite this log having
been printed.
Assume the minimum grant (min_rb) size to be the bandwidth part size. As
an example: rbStart 0, min_rb=bwpSize=106. This should pass, hence
modify these two conditions.
Co-authored-by: Robert Schmidt <robert.schmidt@openairinterface.org>
Signal gNB-DU config update CellStatus from DU to CU
Add the cell status to gNB-DU configuration update message, including
test. Use the gNB-DU configuration update to signal the cell status in
the stack.
This IE was not included in a previous refactoring round, but is at
least necessary to be decoded when interoperating with the OSC O-DU.
Improvements in handling UE context in gNB DU
The goal of this MR is to improve the handling of UE context in gNB DU.
To achieve this goal, the UE structure is created as soon as the gNB
receive a PRACH indication. At that stage the UE is placed in a new
structure containing UEs performing RA, untill RA is complete where it
is moved to the list of connected UEs. To simplify the code and to
improve the handling of initial procedures (see #751), DCI 10 and DCI 00
is used at every stage until the DU receives from CU the indication of
UE RRC reconfiguration being completed.
Remove assert for SRI-PUSCH-PowerControl
SRI-PUSCH-PowerControl is not implemented at this point but its enough
to warn about incorrect power control behavior rather than assert on the
configuration.
Closes#953
Add functionality to trigger the addition of a new RRC UE context (in
the CU) for NSA modes, using F1. This commit makes do-ra and phy-test
modes work. "True" NSA will work in the next commit, which also sends
the X2 addition request answer message.
Use the gNB-DU configuration update to signal the cell status in the
stack. At the DU, modify the code to always send this message --
previously, we only sent this message if a SIB1 update was necessary,
but now it's always, only including SIB1 updates if necessary.
At the CU, as we don't really have a use as of now, print the
information, but don't do anything with it.
- rewrite add_UE_to_list() and rewrite remove_UE_from_list() to simplify
list handling
- return pointer from get_new_nr_ue_inst(); it's completely freed by
delete_nr_ue_data()
- have add_new_UE_RA() add UE context to access list; remove with
nr_release_ra_UE()
- have add_connected_nr_ue() only add UE to connected list; to move from
access to connected use transition_ra_connected_nr_ue(); remove with
mac_remove_nr_ue() as previously
- free memory on problems during RA
- add some documentation
- in NSA/HO: check for pre-configured RA process
- there are asserts in all functions to clarify when a UE has RA
SRI-PUSCH-PowerControl is not implemented at this point but its enough
to warn about incorrect power control behavior rather than assert on the
configuration.
Fix for NR UE DLSCH decoding barrier in case of no feedback
In !3291 NTN CI RFsim test fails with the UE being stuck. After some
investigation, this seems to be caused by the scenario where there is no
feedback for DLSCH. In that case there is no need to wait for DLSCH
being completed before generating feedback (there is no feedback).
Fix ASN1 struct double free
When paging, RA and other SI have same PDCCH search space, we should
free the struct once and reset the other pointers to NULL.