- Set the correct QoS flow ID to associate a correct QoS flow to the
bearer: the UE would misassociate otherwise
- Set the DRB as the default: the handler applies bool with true==1, so
use bool value
This allows to communicate with multiple remote hosts. A further
improvement would be to refactor this piece of code into a function and
call it only when necessary, i.e., when we know the remote host, or want
to add one to a list of hosts.
This commit introduces the capability to handle multiple CU-UPs. It uses
a RB tree and puts the CU-UPs into the tree. Upon the connection, it
associates UEs to CU-UPs in a round-robin fashion.
A later commit will introduce an RB tree to manage multiple CU-UPs. The
RB tree implementation relies on some macros that generate RB tree
functions. Functions using the RB tree implementation will be grouped in
this file.
The E1AP Setup Request contained the network configuration (IP address,
ports) as well as the actual E1AP Setup Request application data
(Supported PLMNs, ...). This has the drawbacks that
- The E1AP Setup Request is stored to retrieve IP addresses in the E1AP
module, which is confusing as the Setup Request, per standard, has no IP
info
- The CU-CP received an E1 Setup Request for configuration during start
up, but it did not actually receive such Setup Request, but merely the
IP configuration to set up the socket
This commit splits the E1AP Setup Request into a "real" Setup Request
for application data, and creates a new type e1ap_net_config_t to group
all IP configuration data. Further, a new ITTI message type
E1AP_REGISTER_REQ is introduced to group both types. What happens is
- RCconfig_NR_CU_E1() reads both E1AP application-level data and IP
configuration, as previously
- The data is sent to the CU-CP. It discards the E1AP Setup Request
data, and only uses the network configuration to set up the socket
- The data is sent to the CU-UP. It uses the network configuration to
connect to the CU-CP, and then sends the E1AP Setup Request to the
CU-CP.
Currently, the CU-CP still stores the Setup Request locally, which will
be changed in the next commit to send it to the RRC.
The DRBLists inside E1AP message are for E-UTRAN. We don't support that
with our CU-CP/UP yet, so remove it to reduce ambiguity and complexity.
For the same reason, we remove the CN Support, which for us is always
"NR".
Integration Branch 2023.w42
See merge request oai/openairinterface5g!2403
* !2368 NR UE SRB0
* !2399 build_oai: Auto-detect if terminal supports colors
* !2398 Correctly load channel models
* !2365 Change PDU_Length and tlv length calculation to be inline with SCF 222.10.02
* !2402 chore(ci): enabling the ARM cross-compilation pipeline
* !2397 fix(ci): improve for parallelism issue in Groovy
* !2405 Clean IDE files and remove old documentation
* properly formatted the finalizeSlaveJob function
* explained the reason and gave an explicit name to the global variable
Signed-off-by: Raphael Defosseux <raphael.defosseux@eurecom.fr>